sales@valsamis.com
713-640-1500
Cruise Ships
M/S Prinsendam
2010 Dry Dock
- Installed Ducting & Fire Dampers.
M/S Glory
2010 Dry Dock
- Supplied & Installed Buffet Exhaust hood & Steel Trunking.
- Supplied & Installed Ducting & HVAC cooling coils.
- Repaired Swimming pool slide piping.
M/S Statendam
2010 Under Navigation
- Supplied & installed solas engine exhaust covers.
- Replaced Hi-temp insulation on economizers.
MSY Wind Spirit
2010 Dry Dock
- Supplied & Installed Ducting & HVAC cooling coils.
- Replaced Engine room ventilation fire Dampers.
- Repaired AIR handling units.
M/S STATENDAM
2009/2010 UNDER NAVIGATION
- Supplied and installed 10 Enthaply Wheels.
- Supplied and installed insulated Solas Engine Exhaust Covers.
NOORDAM
March 2009 Dry Dock
- Installed 3-way Control Valves on the Chilled Water Piping System.
- Installed of S/St Press Fitting piping.
- Installed of Armaflex Insulation on the Chill Water Piping.
- Installed Cabling for 3-way Valves and Sensors.
EURODAM
AUGUST 2009 UNDER NAVIGATION
- Installed 3-way Control Valves on the Chilled Water Piping System.
- Installed of S/St Press Fitting piping.
- Installed of Amaflex Insulation on the Chiil water piping.
- Installed cabling for 3-way valves and sensors.
ROTTERDAM
DECEMBER 2009 DRY DOCK
- Installed 3-way Control Valves on the on the Chilled water Piping System.
- Installed of S/St Press Fitting Piping.
- Installed of Amaflex Insulation on the Chill Water Piping.
- Installed Cabling for 3-way valves and sensors.
- Installed Variable Frequency Drives.
MAGIC
OCTOBER 2008 DRY DOCK
- Sections of Galvanized Ducting and Steel Trunking.
- Fire Dampers.
- Chilled Water Coils.
- Preheat and Reheat Coils.
- Enthalpy Wheels.
- Armaflex Insulation.
WONDER
2009 Under Navigation
- installed Piping & equipment for Grey & Black water system
- Fire Dampers.
- Chilled Water Coils.
- Preheat and Reheat Coils.
- Enthalpy Wheels.
- Armaflex Insulation.
- Loro Piping System
VALOR
2006/2008 DRY DOCK
- Engine Room Insulation and Deckhead.
- Buffet Exhaust System.
HOLIDAY
2008 DRY DOCK
- Supplied and Installed New Engine Room Ventilation Steel Trunking.
DESTINY
2009 DRY DOCK
- Supplied Air Intake Sea Mist Eliminators
TRIUMPH
2006 DRY DOCK
- New Galvanized Ducting on HVAC System
CONQUEST
2009 DRY DOCK
- Supplied and Installed Fire Dampers
VICTORY
2005 DRY DOCK
- Installed Galvanized Ducting